Eight Independent SAP Engagements, from Rescue to Cyber Assurance
Each engagement is structured for a specific point in the SAP program lifecycle or dispute. All report directly to the Board, PE Operating Partner, agency leadership, or retaining counsel, never through the System Integrator. Read the Conflict-Free Pledge.
01 / ENGAGEMENT
Transformation Rescue
For Boards · CEOs · Program Sponsors when the program is already in distress
Full forensic recovery of stalled or failing S/4HANA programs. Root-cause diagnosis, independent recovery roadmap, and co-signed phase gates until value is restored or the Board elects to stop. The SI continues delivery; Ownerstone validates independently and reports only to the Owner.
Duration
3–9 months typical
Reports To
Board / CEO / Sponsor
Program Health Index and failure-archetype diagnosis within 30 days, across both sides of the contract: integrator performance and Owner-side decisions, governance, and adoption
Independent recovery roadmap with kill-switch gates every 90 days
Co-signed quality gates; SI continues delivery under independent validation
Board pack cadence and Value Recovery Bridge against original business case
Clear stop / continue decision framework for the Board
For Boards · Audit Committees · PE Operating Partners
Independent risk validation when the Board or PE firm needs assurance that reported status matches operational reality, before capital exposure crystallizes into loss. Focuses on early detection and capital protection rather than full program takeover.
Duration
30–90 days, or quarterly standing
Reports To
Board / PE Operating Partner / Audit Committee
Program Health Index initial assessment within 30 days
Independent capital-exposure model and cost-to-complete analysis
Failure archetype identification with evidence trail
Board-ready findings and specific recommendations
Optional monthly PHI trend reporting to Chair / Audit Committee
Engagements within this service
8 available
GR-101Architectural Due Diligence
The Challenge
Technical debt, abandoned migrations, and unresolved compliance gaps routinely hide in data rooms, invisible to financial diligence and catastrophically expensive post-close.
Business Value
Protects Purchase Multiple: Prevents overpayment for technical debt. Identifies post-close OpEx reduction. Delivers intelligence that directly improves deal economics.
Risk Eliminated
Eliminates the Black Box acquisition risk, where investors unknowingly acquire $20M–$80M in unbudgeted SAP remediation costs that destroy the investment thesis.
GR-102S/4HANA Readiness & Assessment
The Challenge
Companies that begin without a validated readiness assessment routinely trigger the costliest failure mode: a false start requiring mid-program re-platforming and 40%+ budget overruns.
Business Value
Capital Allocation Accuracy: Directs investment toward the most efficient migration path with a TCO model independent of SI commercial interests.
Risk Eliminated
Prevents False Starts: the most expensive SAP failure mode, triggered when organizations begin programs without validated readiness.
GR-103Software License Negotiation
The Challenge
Most organizations in the $750M–$9B revenue band overpay by 15–25% annually. Indirect Access enforcement actions have resulted in penalties exceeding $50M.
Business Value
Direct EBITDA Lift: Typically $500k–$3M annually in maintenance fee reduction plus protection from unquantified off-balance-sheet audit penalties.
Risk Eliminated
Mitigates Indirect Access claims and True-up liabilities that erode operating margins, a risk compounding every year without independent review.
GR-104RFP Creation & SI Selection
The Challenge
SIs deliberately understate cost to win the contract, then recover through change orders once competitive leverage is exhausted. This is structural, not accidental.
Business Value
Service Quality Assurance: Forces SIs to compete on technical merit. Creates contractual accountability that persists throughout the program.
Risk Eliminated
Eliminates the Land and Expand SI strategy: systematic scope omission at proposal stage, recovered through change orders a properly structured RFP makes indefensible.
GR-105Validation of Project Controls
The Challenge
Boards routinely receive status reports produced by the team being governed. When the SI's interest is to mask problems, transparency depends entirely on their willingness.
Business Value
Timeline Fidelity: Holds the business realization date fixed, protecting the integration timeline your Board committed to stakeholders.
Risk Eliminated
Eliminates Watermelon Status reporting (Green on the outside, Red on the inside), where slippage is concealed until recovery costs are catastrophic.
GR-106Security Role Assessment
The Challenge
GRC and SoD design is almost universally deferred. For publicly listed companies, the regulatory exposure ranges from a material weakness finding to sanction.
Business Value
Brand & Asset Protection: Prevents financial leakage through internal fraud and ensures full SOX compliance.
Risk Eliminated
Removes the risk of catastrophic audit failure, DCAA non-compliance in defense contracting, and FDA 21 CFR Part 11 violations in life sciences.
GR-107End-to-End Testing & Go-Live Oversight
The Challenge
When go-live is driven by a deadline set 18 months earlier rather than verified readiness, the organization inherits the defect backlog the SI could not resolve.
Business Value
Operational Stability: Supply chain and financial systems work on Day 1, protecting market reputation, customer relationships, and revenue continuity.
Risk Eliminated
Eliminates Launch Fever, the documented tendency to go live with known critical defects. Revlon lost $64M. Hershey lost $100M+.
GR-108SAP Cyber Resilience Review
The Challenge
SAP security notes age against exploitation windows now measured in days. Under RISE with SAP the customer keeps application-layer security, yet fewer than half of customers actively follow the shared-responsibility model (SAPinsider, 2025). In most organizations SAP security is owned two levels below the Board.
Business Value
A Board-level answer to five questions: does a validated clean SAP restore point exist, distinct from replication; who owns the customer side of RISE; are exposed components inventoried; does the cyber-insurance questionnaire cover the SAP application layer; and what happens to the close, the covenants, and the disclosure if SAP goes dark for six weeks. Includes a Board tabletop on that last scenario.
Risk Eliminated
The outage that is discovered to be a six-week outage only after it starts. Backups are targeted in most ransomware attacks and compromised in more than half of those attempts (Sophos, 2024). The review establishes whether yours would survive, before anyone needs to find out. For the enterprise-wide view, see Cyber Risk Advisory (CY-101 to CY-106).
For CFOs · Value Offices · PE value-creation teams
Independent quantification of realized versus promised value. Separates delivery activity from actual business outcomes so the Board can see what the investment has produced, and what remains at risk.
Duration
4–12 weeks
Reports To
CFO / Value Office / Operating Partner
Value Recovery Bridge measured against the original business case
Benefit realization audit across process, data quality, and user adoption
Burn-rate and cost-of-delay analysis
Clear recommendations for course correction or controlled wind-down
Executive summary suitable for Board or investment committee
Engagements within this service
10 available
GB-101Divestiture & Carve-Out Strategy
The Challenge
Companies sign 12-month TSAs that extend to 36 and pay $2M–$8M/year to support an asset they no longer own, because SAP separation complexity was never independently designed.
Business Value
Maximized Exit Multiples: A demonstrably clean SAP footprint eliminates TSA costs that erode transaction proceeds by 15–30%.
Risk Eliminated
Prevents the “TSA Trap” where the parent company remains legally and technically tethered to a sold asset for years.
GB-102Post-Merger Integration (PMI)
The Challenge
Every acquisition landing on a separate SAP instance adds $2M–$5M per year in redundant cost and delays synergy realization by 18–36 months.
Business Value
Accelerated Synergies: Drives consolidated reporting and process efficiency required to meet investor growth targets.
Risk Eliminated
Mitigates the risk of fragmented data silos that prevent a consolidated view of customer, inventory, and cash.
GB-104EA Executive Coaching
The Challenge
The most consequential SAP decisions are made by executives who receive information exclusively from the team with the most to lose from transparency.
Business Value
Strategic Alignment: Lets leadership treat SAP as a value driver rather than a cost line. Improves decision quality at the moments when program trajectory is determined.
Risk Eliminated
Mitigates the risk of the C-Suite being “held hostage” by technical jargon during critical business pivots.
GB-105Business Architecture Creation
The Challenge
Fit to Standard means your organization operates identically to every competitor on the same SAP template, a competitive liability for the capabilities that determine your margin.
Business Value
Competitive Differentiation: Keeps SAP configuration aligned to the unique business models that drive market share.
Risk Eliminated
Prevents the “Vanilla Trap” where standard software defaults strip away the company’s unique competitive advantages.
GB-106Strategic Solution Roadmapping
The Challenge
Most organizations have a list of projects and deadlines imposed by external pressure, not a technology roadmap, which creates Islands of Automation.
Business Value
Predictable CapEx: Provides the Board a clear view of future technology funding requirements, converting IT investment from an unpredictable surprise into a plannable commitment.
Risk Eliminated
Mitigates the risk of disparate systems, where short-term fixes create long-term integration bottlenecks.
GB-107Reporting & Analytic Architecture
The Challenge
In fewer than 20% of post-go-live programs reviewed is the analytics business case delivered. The data layer is always the first item cut when budgets compress.
Business Value
Information Advantage: Enables real-time visibility into EBITDA drivers and supply chain performance.
Risk Eliminated
Removes the risk of “Garbage-In/Garbage-Out” leading to flawed strategic decisions based on inaccurate data.
GB-108Business Process & Value Mapping
The Challenge
In most programs, no mechanism exists to answer how much of the financial return promised by the business case has actually been delivered.
Business Value
EBITDA Optimization: Every dollar of SAP customization traces to a measurable financial gain.
Risk Eliminated
Mitigates the risk of “Gold-Plating”: spending capital on technical features that offer no business value.
GB-109Business Capability Mapping
The Challenge
Attempting to innovate everything simultaneously ensures nothing is transformed effectively. Capital disperses, timelines extend, and the program delivers incremental improvement everywhere.
Business Value
Resource Optimization: Focuses limited capital on Differentiator capabilities driving margin and market share.
Risk Eliminated
Eliminates the “Boil the Ocean” risk where projects fail by attempting to transform non-critical functions simultaneously.
GB-110AI & Innovation Readiness
The Challenge
Every major SAP SI is offering AI capabilities layered on S/4HANA. AI is only as reliable as the data it consumes, and most S/4HANA implementations are not data-ready.
Business Value
Future-Proofing: Positions the organization to adopt AI capabilities faster and more reliably than competitors with a validated data foundation.
Risk Eliminated
Prevents the risk of deploying AI on “Dirty Data,” which leads to hallucinated results and poor automated decisions.
GB-111Cloud Deployment Strategy
The Challenge
RISE with SAP is not a cloud strategy. Organizations signing without independent TCO modeling discover the 5-year cost is 40–60% higher than the approved business case.
Business Value
OpEx Efficiency: Optimizes cloud investment while ensuring the system can scale, a financially defensible Cloud Right strategy.
Risk Eliminated
Mitigates the risk of “Cloud Bill Shock” and legal penalties associated with data residency (Sovereignty) violations.
For COOs · CIOs · Process owners post go-live or in hypercare
Stabilization and control when the system is live but fragile. Focuses on data integrity, process ownership, support model clarity, and a sustainable operating cadence that does not rely on the original SI.
Duration
6–16 weeks
Reports To
COO / CIO / Sponsor
Post-go-live health and data reconciliation assessment
Support model and accountability map
Hypercare redesign with explicit exit criteria
Independent PMO / governance cadence for the run phase
Transfer of ownership back to the business with clear residual risk register
Engagements within this service
7 available
GO-101Clean Core Governance
The Challenge
Without formal governance, the average implementation adds 300–600 custom objects within 18 months. Within three years, the system cannot be upgraded without a program-scale intervention.
Business Value
Agility & Lower TCO: Dramatically reduces the cost and time of future upgrades, keeping the enterprise current with SAP innovation cycle.
Risk Eliminated
Mitigates Architectural Paralysis, the state where a system is so heavily customized it can no longer be updated without a program-level effort.
GO-102Architecture Health Checks
The Challenge
Production SAP systems drift. Performance baselines degrade. The systems that fail most visibly are rarely the ones that appeared broken; they were quietly deteriorating.
Business Value
Revenue Protection: Prevents system downtime and performance degradation that disrupts sales, manufacturing, and financial close.
Risk Eliminated
Removes the Silent Failure risk, where technical debt accumulates undetected until a catastrophic failure occurs during peak demand or quarter-end close.
GO-103System Integrator (SI) Oversight
The Challenge
Every major SI has a financial interest in marking its own work as satisfactory. Change request volume increases. Quality gate rigor decreases. The client has no independent basis to challenge either.
Business Value
Contractual Protection: Holds the SI to the code quality and configuration fidelity promised in the SOW, creating independent accountability that makes the contract commercially enforceable.
Risk Eliminated
Mitigates Vendor Lock-in, where the SI creates complex, undocumented code to ensure long-term organizational dependency and maximize post-go-live support revenue.
GO-104Integration Architecture
The Challenge
Every point-to-point connection between SAP and a third-party system is a liability: unmaintained, undocumented, and dependent on individuals whose tenure may not outlast the integration.
Business Value
Enterprise Flow: Moves data cleanly between systems, eliminating manual reconciliations, billing errors, and order processing failures.
Risk Eliminated
Prevents Spaghetti Architecture: the fragile, undocumented integration landscape that makes the IT environment brittle, insecure, and prohibitively expensive to maintain.
GO-105Architecture Review Board (ARB)
The Challenge
Every program has a design blueprint. In programs that fail, the blueprint is still present at post-mortem, but the program delivered something different through hundreds of undocumented design changes.
Business Value
Scope Control: Acts as the program's highest technical authority, maintaining the integrity of the original business case against the forces that cause scope to expand until delivery becomes impossible.
Risk Eliminated
Mitigates Technical Drift, where unapproved customizations incrementally break the core system, bypass security controls, and create liability discovered only in production.
GO-106Application Rationalization
The Challenge
The average organization running S/4HANA continues paying maintenance fees on 15–30 applications the SAP implementation was supposed to eliminate, because no one owns the decommissioning decision.
Business Value
Cost Consolidation: Immediate, recurring reduction in third-party licensing, support labor, and integration complexity, converting redundant application spend into direct operating margin improvement.
Risk Eliminated
Eliminates App Bloat, the proliferation of redundant applications that increases cybersecurity attack surface, fragments operational data, and creates integration liabilities.
GO-107Technical Debt Assessment
The Challenge
Technical debt is the most common hidden expense on a technology balance sheet. In every SAP program that has exceeded budget, the dominant cause was legacy debt that was never measured.
Business Value
Informed Decisioning: Provides the Board with a clear financial value for the hidden mess, enabling accurate program budgeting that does not collapse when the true cost of the legacy landscape is encountered.
Risk Eliminated
Removes the risk of building modern innovation on a structurally compromised foundation, where technical debt discovered mid-program triggers the scope changes and budget overruns that define SAP failure.
For Federal & State agencies · Public-sector authorities · Regulated private companies
Independent, conflict-free verification and validation of SAP / ERP programs against contractual requirements, technical standards, and mission outcomes. Built for organizations that must demonstrate objectivity to inspectors general, oversight bodies, or boards without relying on the delivery SI or the program team under review.
Duration
8–24 weeks, or multi-year standing
Reports To
Agency CIO / Program Executive / Board
Independent baseline assessment of schedule, cost, technical performance, and risk against the approved baseline
Continuous or periodic verification of deliverables, configuration, data quality, and testing evidence
Validation that the system as built meets stated requirements and is ready for operational acceptance
Objective status reporting suitable for federal/state oversight, IG review, or board governance
Findings and recommendations that remain fully independent of the SI and internal program office
For Law firms · In-house counsel · Boards and PE sponsors facing SAP / ERP disputes, including cyber-related SAP disputes
Forensic technical and program expertise for counsel handling SAP-related litigation, arbitration, or regulatory investigations. Ownerstone translates complex ERP failure patterns into clear, defensible findings for judges, arbitrators, and opposing parties. Engaged by and reporting to retaining counsel, so the work can be conducted under counsel’s privilege and work-product protections.
Duration
Case-dependent, typically 3–18 months
Reports To
Retaining counsel
Independent forensic reconstruction of program timeline, root causes, and responsibility allocation
Written expert reports and declarations suitable for discovery, summary judgment, or trial
Deposition and trial testimony on SAP architecture, implementation practices, SI performance, and industry standards
Support for damages models tied to schedule delay, cost overrun, lost benefits, or write-off exposure
Coordination with counsel under privilege; clear separation from any concurrent advisory work for the same party
Findings written to survive cross-examination, never to favor the retaining party: where the evidence points at the Owner’s own decisions, the report says so
For Boards · Audit Committees · CFOs · PE Operating Partners, when a cyber event has taken SAP down
Independent, Board-facing assurance during an SAP recovery, from the first call. Ownerstone stands up the Owner’s response: sets the evidence-preservation protocol, selects and oversees the forensic responder, and preserves the Board’s decision rights before anyone commits to a restoration. The responders and the incumbent System Integrator do the technical work; Ownerstone answers the three questions nobody else in that room is independent enough to answer: Is the recovery plan credible? Can what comes back be trusted? What does this do to the close, the covenants, and the disclosure?
Duration
From the first call; weekly to stabilization; typically 4–12 weeks. Available on a pre-negotiated annual retainer with a direct line to the principals and guaranteed response.
Reports To
Board / Audit Committee / CFO; PE Operating Partner as sponsor
Independent review, within 72 hours, of the restoration plan and sequence proposed by the incumbent SI and the incident-response firm: finance, operations, and customer access first
Restoration-integrity assessment of the recovered SAP landscape: restore-point age, clean-room validation before reconnection, evidence that backups were not themselves compromised
Reconciliation plan for transactions processed by hand during the outage, before they are re-keyed into SAP
A close-and-reporting timeline the CFO can take to auditors and counsel, including the materiality decision
Where a transformation is in flight, an assessment of what the incident does to schedule, budget, and cutover risk
Weekly independent status report to the Board. The incumbent’s recovery is validated, not narrated.
What this engagement is not
We direct and verify the response; we do not operate it. Forensic collection, hands-on containment, monitoring, penetration testing, and ransom negotiation are performed by specialist firms the Owner selects on our recommendation and contracts directly. Ownerstone takes no fee from any of them. Retainer capacity is capped to the number of clients the principals can serve with a guaranteed response.
For Boards · Audit and Risk Committees · CFOs · PE Operating Partners, before an incident and after one
The cyber view a Board can act on, delivered by an advisor with no stake in the tooling, the responders, or the remediation. Exposure expressed in dollars rather than heat maps, the regulatory position stated plainly, the risks sitting with integrators and hosting providers brought onto the Board’s agenda, and the insurance tested before it is needed. Led by Dr. Alexander Miranda.
Duration
4–8 weeks for an assessment; continuous for fractional leadership and third-party oversight
Reports To
Board / Audit or Risk Committee / CFO
Cyber exposure quantified in dollars and reported in the Board’s own risk language
Regulatory and framework position assessed with the SAP application layer in scope
Integrators and hosting providers managed as named risks, not procurement entries
Response readiness rehearsed at Board and executive level before it is needed
Insurance tested against actual exposure, and the claim prepared to be paid
Engagements within this service
6 available
CY-101Cyber Risk Quantification
The Challenge
Boards are shown heat maps and maturity scores that cannot be compared to any other risk on the agenda, so cyber spend is approved or refused on instinct.
Business Value
Exposure modeled in dollars (FAIR, Monte Carlo) with Board-ready reporting, so a cyber risk can be weighed against any other capital risk and the Board can decide what to accept, transfer, or spend against.
Risk Eliminated
The decision made blind: over-insuring one exposure while leaving the SAP landscape, the largest single point of failure in order-to-cash, unpriced.
CY-102Regulatory and Framework Assessment
The Challenge
NYDFS Part 500, NIST CSF and 800-53, ISO 27001, SOC 2, CMMC, FedRAMP, PCI DSS, FFIEC: each asks a different question, and the SAP application layer is routinely assumed rather than tested.
Business Value
The gap stated in the regulator’s own terms, with SAP-specific controls (security notes, RISE shared responsibility, authorizations, interfaces) included in scope rather than delegated to the integrator’s attestation.
Risk Eliminated
The finding that arrives from the examiner or the auditor first. Under DORA, SAP is now a designated critical ICT third-party provider; the obligation to manage that risk sits with the Owner.
CY-103Third-Party Cyber Risk: Integrators and Hosting Providers
The Challenge
The party with the most privileged access to SAP, the System Integrator or the hosting provider, is usually the least examined. Clorox’s $380M claim against its service desk provider turned on exactly this.
Business Value
Due diligence and continuous oversight of the integrator, the hosting provider, and the RISE with SAP shared-responsibility boundary, reported to the Board as a risk register line rather than a procurement checkbox.
Risk Eliminated
Access granted on trust and never reviewed; a breach that enters through the vendor’s credentials and is discovered through the Owner’s outage.
CY-104Incident Response Readiness
The Challenge
Most organizations rehearse an incident for the first time during one. The plan exists; the people who have to execute it have never met in that configuration.
Business Value
Response procedures, executive and Board tabletops, simulations, and team training built on the public record, including the scenario the register documents repeatedly: SAP goes dark for six weeks.
Risk Eliminated
The first real incident being the first rehearsal; a Board that learns its own decision rights, disclosure clock, and reporting obligations while the clock is running.
CY-105Fractional CISO and Board Reporting
The Challenge
Mid-market and portfolio companies carry enterprise-scale SAP risk without an executive whose job is to own it, and the Board hears about security from the people whose performance is being described.
Business Value
Executive security leadership on a fractional basis, with reporting written for directors: what changed, what it costs, what decision is needed. Independent of the IT organization it reports on.
Risk Eliminated
Security owned two levels below the Board, which is where the surveys show it sits in most SAP shops, and where it stays until an incident moves it.
CY-106Cyber Insurance Readiness and Claims Support
The Challenge
Jaguar Land Rover had no cyber cover in force when it was attacked. Marks & Spencer expected eighteen months to settle. Underwriter questionnaires rarely ask about the SAP application layer at all.
Business Value
Coverage assessed against actual exposure, renewal submissions that answer the SAP-layer questions underwriters do not ask, and claims preparation when an event occurs, so the policy responds the way the Board assumed it would.
Risk Eliminated
Discovering the exclusion, the sub-limit, or the unanswered warranty after the loss; a recovery funded from cash because the claim was not prepared to be paid.
What this engagement is not
Advisory and assessment only. Ownerstone does not operate security, resell tooling, run monitoring, or perform penetration testing. Where such work is needed, the Owner selects and contracts the specialist directly on our recommendation, and Ownerstone takes no fee from any of them.
Confidential. No obligation. Reply within one business day.
Ownerstone is a management advisory firm. It is not a law firm, does not provide legal services or legal representation, and does not provide attest or audit services as those terms are defined under applicable professional standards. Expert witness and litigation support engagements are performed for retaining counsel; privilege and work-product protections are determined by that counsel and the relevant tribunal. See our Terms of Engagement.
Request this service
Request Received
A senior advisor will reply within 24 hours to arrange a short introductory call and confirm scope.
We Could Not Send That Just Now
Nothing you typed has been lost. Try again, or copy your details and email them
to [email protected].